Project: Ford TEVC Paint Shop
Location: Stanton, TN
Client: Walbridge
Project Details
In addition, a new fire alarm system was installed including 60,000 feet of fire alarm cable and 300 devices, providing the necessary fire safety for the facility. And last but certainly not least, finishing touches included 1700 new light fixtures were supplied by over 58,000 feet of modular wiring.
The scope of this project was expansive, highlighting Slifco Electric’s ability to provide any type of a wide range of electrical installations. Able to adapt to any challenge in the field, Slifco Electric was able to guarantee that seismic engineering was incorporated to meet all necessary installation requirements. Slifco Electric maintained a great safety record while completing the project and is proud to have contributed to this world-class facility.